| CASE
STUDY - Richmond House |
|
| Laing
O’Rourke Northern Ltd
|
| Project: |
Richmond
House, Rumford Place, Liverpool |
| Client: |
Rumford
Investments |
| Planning
Supervisor: |
Goyne
Adams, 7-8 Market Place, London, W1W 8AG |
| Principal
Contractor: |
Laing
O’Rourke Northern Ltd, Curtin House, Columbus Quay, Riverside
Drive, Liverpool, L3 4DB |
| WFL
Engineer: |
Faber
Maunsell, Lynnfield House, Church Street, Altrincham, WA14 4DZ |
| Contract
Description: |
The
deconstruction, demolition and site clearance of a five-storey
reinforced concrete framed office building with a reinforced
concrete car park underneath. Site adjacent to Thistle Hotel and surrounded by busy city centre
streets, including access to NCP Car Park. Site also sits on top
of the exit of one of the Mersey Tunnels. |
| Value: |
£540,000 |
Timescale: |
23
weeks – January 2004 to May 2004 |
| Building
Dimensions: |
85m
x 55m x 20m high (+ 8m underground) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Building
Construction:
Richmond
House was mostly a conventional reinforced concrete building. The office tower
block wall was constructed with load bearing precast wall panel units. These
carried all the load from the edge of the floor slabs. Matching precast units
were used for the parapets and for the trimming edge beam cast into the floor
slab above the ground floor. These precast units were all made using a special
decorative concrete mix that included glass aggregate. A high proportion of the
parapets and wall units were deteriorating.
The building had an internal courtyard at podium level and there was car parking
levels below basement offices.
Demolition
Method:
Scaffolding with monarflex sheeting was erected around the outside of the building
and within the courtyard. Rather than deconstruct the whole structure by hand,
we came up with the idea of forming a 20mx12m hole in the central courtyard section
of the building down to the basement slab and erecting a 34m high luffing jib
tower crane on the original tower crane base, used to build the structure in
the 1960’s.
Deconstruction of the top two floors on 3 elevations and all six floors on the
Thistle Hotel elevation was achieved using mini-excavators with through-propping
to floors for additional loads. The wall panels were lifted down to the ground
using the tower crane and the floors broken out onto the floor below and then
deposited down the lift shafts using skid-steer loaders.
The scaffolding was then completely removed and the remaining floors were demolished
using a long reach excavator fitted with a 360o rotating concrete pulverisor.
Close liaison with Liverpool City Highways Department was paramount, due to ever-changing
road diversions, to ensure the public were protected at all times.
Environmental considerations were also taken into account. We sited four noise
monitors and four seismographs around the site recording information daily. This
ensured the neighbours were happy and warned us early of any potential damage
to the underground Mersey Tunnel structure.
We held regular meetings with the neighbouring hotel and businesses to keep them
informed of our activities and to allow them to raise any concerns.
Reference
Details:
Please contact WFL for reference contact details.
See attached letter from Laing O’Rourke Northern Ltd. |
|
|