CASE STUDY - Olive Mount Heights, Liverpool
Tweeds Project Services Ltd
Project: Demolition of Olive Mount Heights
Client: Liverpool Housing Action Trust, now taken over by English Partnerships
Planning Supervisor: Tweeds Project Services Ltd, 82-84 High Street, Mold, Flintshire, CH7 1BQ
Project Manager: Mr. John Finch, Tweeds, Cavern Court, 8 Mathew Street, Liverpool, L2 6RE
Principal Contractor: Walter Forshaw Ltd, 7 King Street, Westhoughton, Bolton, BL5 3AY
WFL Engineer: Healey Brown Partnership, Brunel House, 63 Dale Street, Milnrow, Rochdale, OL16 3NJ
Contract Description: Demolition of three no. 14-storey residential tower blocks, removal of all foundations and remedial landscaping works.
Value: £793,000 Timescale: February 2006 to July 2006
Olive Mount Heights
Olive Mount Heights
Olive Mount Heights
Olive Mount Heights
Olive Mount Heights
Olive Mount Heights
Olive Mount Heights
Olive Mount Heights
     
Letter-from-Tweeds

Building Construction:

The site comprised three number 14-storey tower blocks comprising 39 number one bedroomed flats and 26 number two bedroomed flats. The tower blocks, built in 1963, consisted of a reinforced concrete frame with inner block walls, precast concrete floors and roofs with reinforced ground slab and reinforced concrete foundations. There were also sub-basements and lift pits. The Community Centre was a single storey brick built structure with a pitched roof.


Demolition Method:

The blocks were soft-stripped and subsequently demolished in their entirety using our Hitachi EX800 Super Reach demolition excavator fitted with a concrete pulverisor with 360o rotation. The site was levelled and tracked over in preparation for the subsequent housing development.

Over the last few years we have demolished a total of 11 similar tower blocks for the same client in the Liverpool area.
See attached letter of recommendation from Tweeds.